AGA 4 in 1 Instructions
![AGA 4 in 1 Mixertap manual cover](/images/IFQgzzmUWQjFjvAmdyeSxmJU/thumbs/thumb175x175.webp)
To install the AGA 4 in 1 Mixertap, first ensure the water supply is turned off. Follow the installation guide provided, which typically involves attaching the tap to the sink, connecting the hoses to the water supply, and securing the boiler unit under the sink.
Check if the water supply valves are fully open. If the issue persists, examine the tap aerator for any blockages or mineral build-up and clean it if necessary.
Regular descaling is essential to maintain performance. Use a descaling solution recommended by the manufacturer. Turn off the boiler, let it cool, and follow the descaling procedure as described in the user manual.
Inspect the tap connections and ensure they are tight. If the leak persists, check the condition of the O-rings and seals, replacing them if worn or damaged.
Yes, the AGA 4 in 1 Mixertap is compatible with water softeners. Ensure that the water softener is properly maintained to avoid any impact on the tap's performance.
The water temperature can be adjusted using the control on the boiler unit. Refer to the user manual for specific instructions on setting your desired temperature.
Clean the tap with a soft cloth and mild detergent. Avoid abrasive cleaners or scrubbers that could damage the finish. Regular cleaning prevents build-up of grime and limescale.
Check if the boiler unit is powered on and ensure the temperature setting is correct. If the problem continues, inspect the power supply and reset the unit as per the manual instructions.
To reset the boiler unit, turn it off, wait for a few minutes, and then power it back on. Refer to the user manual for detailed reset instructions if needed.
Regular maintenance includes cleaning the aerator, descaling the boiler unit, and checking for any leaks or loose connections. Refer to the maintenance schedule in the user manual for detailed guidance.