Sealey SSCL1.V2 Instruction Manual
![Sealey SSCL1.V2 Scaffolding manual cover](/images/natjkjQzaflWYyBQixXOJuEZ/thumbs/thumb175x175.webp)
The Sealey SSCL1.V2 Scaffolding has a maximum load capacity of 150 kg.
To set up the Sealey SSCL1.V2 Scaffolding, ensure the ground is level, unfold the scaffold, secure the locking pins, and adjust the platform to the desired height. Always follow the manufacturer's assembly instructions.
Always wear a safety harness when working at height, ensure the scaffold is stable, do not exceed the load capacity, and inspect the scaffold for damage before use.
Regularly inspect for rust, tighten all fasteners, lubricate moving parts, and store in a dry place to prevent damage.
Immediately stop using the scaffold, ensure the ground is even, check that all locking pins are secure, and redistribute weight evenly.
Yes, the platform height can be adjusted to suit your working requirements. Always ensure the platform is securely locked in place after adjusting.
Yes, the Sealey SSCL1.V2 Scaffolding can be used outdoors, but ensure it is stable and secure, especially in windy conditions.
The Sealey SSCL1.V2 Scaffolding is constructed from durable steel with a powder-coated finish for corrosion resistance.
Inspect the scaffolding before each use and periodically during long projects to ensure it remains in safe working condition.
Do not use the scaffolding if any part is damaged. Contact the manufacturer or a qualified technician for repairs or replacement parts.