Sealey SC10LR.V3 Instruction Manual
![Sealey SC10LR.V3 Crane manual cover](/images/ZzrvSWgZbOVSUerUTMLITIcy/thumbs/thumb175x175.webp)
The Sealey SC10LR.V3 Crane has a maximum lifting capacity of 1 tonne.
To properly assemble the Sealey SC10LR.V3 Crane, refer to the user manual for step-by-step instructions. Ensure all bolts are tightened securely and components are correctly aligned.
Regular maintenance includes checking for hydraulic leaks, ensuring all bolts are tight, lubricating moving parts, and inspecting the crane for any signs of wear or damage.
If hydraulic issues arise, check the fluid level, inspect hoses for leaks, and ensure there are no airlocks in the system. Refer to the troubleshooting section of the manual for further guidance.
Always use the crane on a stable, level surface, do not exceed the maximum lifting capacity, and ensure the load is securely attached before lifting. Wear appropriate safety gear.
To adjust the boom length, release the locking pin, extend or retract the boom to the desired position, then reinsert and secure the locking pin.
Ensure the hydraulic fluid levels are sufficient, inspect for leaks, and check that the load is within the crane's capacity. Consult the manual if issues persist.
Yes, the Sealey SC10LR.V3 Crane can be used outdoors; however, ensure it is used on a stable surface and protected from adverse weather conditions when not in use.
Store the crane in a dry, sheltered area. Retract the boom and secure all parts to prevent movement or damage. Regularly inspect for any signs of rust or wear.
Before each use, check for hydraulic fluid levels, inspect for any visible damage or wear, ensure all bolts and pins are secure, and test the crane's operation without a load.