GE RAVDPLAT Installation Instructions
![GE RAVDPLAT Drain Platform manual cover](/images/YwxzQiqzPirPyPcRWmDUtYSR/thumbs/thumb175x175.webp)
The GE RAVDPLAT Drain Platform has a maximum load capacity of 500 pounds, making it suitable for most standard applications.
To install the GE RAVDPLAT Drain Platform, first ensure that the surface is level. Align the platform with the drain, secure it with the provided bolts, and check for stability before placing any equipment on top.
The GE RAVDPLAT Drain Platform is constructed from high-density polyethylene (HDPE), which is known for its durability and resistance to corrosion.
Yes, the GE RAVDPLAT Drain Platform is designed for both indoor and outdoor use, with UV resistance to withstand exposure to sunlight.
Routine maintenance should be performed every 6 months, including cleaning the surface and inspecting for any signs of wear or damage.
If the platform becomes unstable, check the surface it is placed on for levelness, re-tighten all bolts, and ensure there are no obstructions under the platform.
To clean the platform, use a mild detergent with water and a soft brush. Rinse thoroughly and allow it to dry completely before use.
The GE RAVDPLAT Drain Platform measures 48 inches in length, 24 inches in width, and 6 inches in height.
While the platform is sturdy, it is best to distribute weight evenly to maintain stability and ensure longevity.
Anchoring is not typically necessary unless the platform is used in an area prone to high winds or vibrations that could cause movement.