Clarke 7320175 King150 Hot Instructions
![Clarke 7320175 King150 Hot Washer manual cover](/images/iHibDFZYkTTkvMmODLaGwYBH/thumbs/thumb175x175.webp)
To start the Clarke 7320175 King150 Hot Washer, first ensure it is connected to a suitable power supply and water source. Turn the power switch to the 'ON' position, then press the start button. Allow the machine to warm up before using.
Check the thermostat settings and ensure they are set correctly. Additionally, inspect the heating element for any faults or damage, and ensure the water supply is adequate.
Regularly clean the filters and replace them as needed. Check hoses and connections for leaks or wear. Perform routine inspections of the heating element and thermostat to ensure they are functioning correctly.
First, check the inlet filter for any blockages. Ensure the nozzle is not obstructed and the spray gun is functioning properly. Verify that the water supply is sufficient and the pump is operating correctly.
Disconnect the power supply and water source. Drain any remaining water from the system to prevent damage from freezing. Store the unit in a dry, cool area away from direct sunlight or moisture.
It is recommended to use detergents that are specifically formulated for pressure washers. Avoid using bleach or highly abrasive chemicals that could damage the internal components.
Use water softeners if your water supply is hard. Regularly clean the system with a descaling agent to remove any lime scale deposits that may form.
Stop the machine immediately and inspect for any loose parts or debris in the pump. Check the bearings and motor for wear or damage. If the problem persists, consult a professional technician.
Always wear appropriate personal protective equipment such as gloves and goggles. Do not point the spray gun at people or animals. Ensure the machine is on a stable surface to prevent tipping.
Service intervals depend on usage frequency, but generally, a comprehensive service should be performed annually. Regular checks and maintenance should be done monthly to ensure optimal operation.